STRETCH®
TechnicalPVC film

Installation guide.

Heat-mounted PVC film — fully recyclable, removable and seamless to 6.4 m.

PVC film is warmed and tensioned on install — a tired ceiling becomes a flawless new one in a single day, with the old surface left in place underneath.

  1. Survey & measure

    The room is measured and the film is high-frequency welded to size with a perimeter harpoon edge, made to the shape of the room and seamless up to 6.4 m wide.

  2. Fit the perimeter profile

    A harpoon/clip profile is fixed around the room at the chosen height, following the wall line and any features.

  3. Heat & tension

    The space is warmed with a heat source to soften the film; the harpoon edge is hooked into the profile and the film tensions taut and flat as it cools.

  4. Finish & detailing

    Edges, corners, light fittings and inspection hatches are finished. The film wipes clean and is immediately serviceable.

Need a hand with the specification?

Our specialists help architects and contractors get the detail right — usually within two working days.